Loading...
Project Information
Investment ID: P089659
Bank: World Bank
Environmental Category: A
Country: Uganda
Region: Sub-Saharan Africa
Approval Date: April 26, 2007
Investment Types:
Total Project Cost: No recorded data on this
Total Complaints: 2
Description
The Private Power Generation (Bujagali) Project's main objective is to provide least-cost power generation capacity that will eliminate power shortages at the time of its commissioning. The following are the components of the Project: a) the power station which is designed to house the complete generation plant and all five units, and to carry out all operational and maintenance related activities; b) The power intakes which will be capable of operating over the full range of Head Pond levels and turbine discharges without hydraulic instability or vortex formation; c) Spillways and dam embankment; d) The tailrace canalization which will be excavated down to 1,070.5 meters above mean sea level at the outlet of the draft tubes; e) Abutments and substation; f) Access roads; g) Impoundment area; h) Engineering, procurement and transportation; and i) Reservoir filling.
Investments
Investment Type | ID | Amount | Status | Bank | Client |
---|---|---|---|---|---|
P089659 | USD 115.0 million | Planned | WB |
Related Complaints