Register / Login

Loading...

Uttarakhand Power Sector Investment Pro gram

Sectors

Energy

Description:

Projects in this Sector: 252

Browse Projects

Issues Raised

Unknown

Description:

Projects with this Issue Raised: 914

Browse Projects

Project Information

Investment ID: Loan 2924-IND

Bank: Asian Development Bank

Environmental Category: B

Country: India

Region: South Asia

Approval Date: Oct. 26, 2012

Investment Types: Loans

Total Project Cost: USD 214.3 million

Total Complaints: 1

Description

The project will expand the transmission evacuation system in Uttarakhand resulting in rapid expansion of hydropower. Approximately 6,000MW of hydropower capacity is expected to be developed in Uttarakhand by 2021, of which 2,700MW will be added in Alaknanda river basin. The project will establish a strong and reliable bulk power evacuation system of 2,500MW capacity connecting Uttarakhand to the Northern Grid. The proposed tranche will have the following outputs: (i) construction of 400/220kV 2 x 315MW GIS substation in Pipalkoti; and (ii) construction of 400kV double circuit (D/C) from Srinagar to Kashipur Transmission Line (152.8km).

Investments

Investment Type ID Amount Status Bank Client
Loans Loan 2924-IND USD 150.0 million Approved ADB

Related Complaints

Asian Development Bank SPF CRP Complaints IAM Country Date Filed Status
Uttarakhand Power Sector Investment Pro gram ADB SPF CRP India 28/02/2019 Active

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
Uttarakhand Energy Department (UED)